Construction Magazine January 2018 | Page 73

EUROPE
infrastructure . Thanks to the cooling system , the business is able to go to a high capacity per rack , meaning that space and temperature are not issues .
Larger companies needing over two megawatts of data space can expect to have the space they need created within six months , and while Green Mountain is unable to be quite as flexible with this option , it is still one of the most efficient choices . This level of flexibility is made simple thanks to Green Mountain ’ s grasp of advanced IT . After identifying early on that the business required a DCIM ( data centre infrastructure management )
Sustainability is key to Green Mountain ’ s operations www . constructionglobal . com 73